A large manufacturer, designer and supplier of LED Lighting
Telford, West Midlands
In line with their expansion plans, our client moved into a new warehouse and asked us to design a storage solution that would give them maximum pallet capacity whilst simultaneously allowing them access to every single pallet stored.
A Narrow Aisle configuration which allowed the client the use of an articulated truck to take advantage of the height available in the warehouse. We also introduced an additional run of ‘despatch’ pallet racking by the goods out area, thus enabling storage of picked goods prior to despatch. This in turn freed up floor space for other activities.
Polymer, high impact resistant pedestrian barriers and column protectors were also added.
The client benefited from 4400 fully labelled pallet positions and 50 ‘Goods Out’ locations with additional space for operational activities. We also enabled protected pedestrian access to the warehouse, facilities and assembly area.
Ingleby Place
Pool Furlong
Clent
Stourbridge
Worcestershire
DY9 9RE
©2026 Qubestor Ltd - All Rights Reserved.